J. Kadarian Tower: Difference between revisions

From BetaMC Wiki
Jump to navigation Jump to search
No edit summary
 
(6 intermediate revisions by the same user not shown)
Line 21: Line 21:
| Rooftop  || Outdoor Observatory || View Of Grenzstadt || || March 5 2026
| Rooftop  || Outdoor Observatory || View Of Grenzstadt || || March 5 2026
|-
|-
| Floor 14 || Restaurant || Windows Of Grenzstadt || Janoskadar1991 || March 5 2026
| Floor 14 || Restaurant || Windows Of Grenzstadt || [[Beta Trade Center Authority]] || March 5 2026
|-
|-
| Floor 13 || Conference Room || Conference Floor ||  || March 5 2026
| Floor 13 || Conference Room || Conference Floor ||  [[Beta Trade Center Authority]] || March 5 2026
|-
|-
| Floor 12 || Library || Library Of Grenzstadt || VanillaCake || March 5 2026
| Floor 12 || Library || Library Of Grenzstadt || VanillaCake || March 5 2026
|-
|-
| Floor 11 || Office || Oasis Bank || Janoskadar1991 || March 6 2026
| Floor 11 || Office || Oasis Bank || [[Oasis]] || March 6 2026
|-
|-
| Floor 10 || Residency || Ostlanda Residency || Ostlanda1967 || March 8 2026
| Floor 10 || Residency || Ostlanda Residency || Ostlanda1967 || March 8 2026
|-
|-
| Floor 9 || Example || Example || Example || Example
| Floor 9 || Embassy || JanoSSR Embassy || [[Jano SSR]] || April 22 2026
|-
|-
| Floor 8 || Example || Example || Example || Example
| Floor 8 || Office || Mt. China bank || [[china]] || April 25 2026
|-
|-
| Floor 7 || Example || Example || Example || Example
| Floor 7 || Embassy || Ostreich Embassy || [[Ostreich]] || May 9 2026
|-
|-
| Floor 6 || Residency || Treefoi Residency|| Treefoi || March 8 2026
| Floor 6 || Residency || Treefoi Residency|| Treefoi || March 8 2026
|-
|-
| Floor 5 || Example || Example || Example || Example
| Floor 5 || Office || Reich Banko || Ostlanda1967 || May 9 2026
|-
|-
| Floor 4 || Example ||   || ||  
| Floor 4 || Office || Kebab-Yars  || [[Jano SSR]] || May 9 2026
|-
|-
| Floor 3 || Example || Example || Example || Example
| Floor 3 || Office || Ostreich-JanoSSR Attache to Grenzstadt || Janoskadar1991 & Ostlanda1967 || May 9 2026
|-
|-
| Floor 1-2 || Main Lobby ||  ||  ||  
| Floor 1-2 || Main Lobby ||  ||  ||  
|}
|}


{| class="wikitable"
The tower was built as a combined concept by Janoskadar of which the '''Windows of the World of the North Tower''' and the '''Outdoor Observatory of the South tower''' of which he combined in design which resulted with the J. Kadarian tower. Originally it was suppose to be twin towers but due to the space being small and not able to acomodate a second tower and financial strain the design changed.
|+ Timeline Of Tenants (March 2026-)
|-
! Owner !! Floor !! Occupation !! Date
|-
| Ostlanda1967 || Floor 10 || Residency || March 8 2026 -
|-
| Treefoi || Floor 6 || Residency || March 8 2026 -
|-
| Oasis Bank || Floor 11 || Office || March 6 2026 -
|-
| Poopywuzhere || Floor 3 || Residency || March 10 - 11 2026
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|-
| Example || Example || Example || Example
|}


== The May 9 Deal ==
On May 9 2026, Ostlanda1967 and Janoskadar1991 signed an official document which the remaining available floors of the tower is sold to Ostlanda1967 for $2k+ in addition of a Skyscraper construction in [[Jano SSR]].


The tower was built as a combined concept by Janoskadar of which the '''Windows of the World of the North Tower''' and the '''Outdoor Observatory of the South tower''' of which he combined in design which resulted with the J. Kadarian tower. Originally it was suppose to be twin towers but due to the space being small and not able to acomodate a second tower and financial strain the design changed.
[[Category:Lore]]

Latest revision as of 01:09, 19 May 2026

The J. Kadarian Tower is a skyscraper located at Grenzstadt serving as the tallest tower at the town as it reached at the height limit, consisting 14 floors. Designed and built by Janoskadar1991. Construction started in mid-February 2026 with full construction taking place on March 4 2026 and fully completed on March 5 2026. The tower is known for having a clear view of Grenzstadt with its outdoor observatory and a restaurant located at the 14th floor called "Windows Of Grenzstadt". It also has a floor dedicated for conferences at the 13th floor along with a library at the 12th floor called "Library of Grenzstadt".

The J. Kadar Tower seen from the new Grenzstadt spawn.
Main lobby of the Tower

Other Features

Observatory which lets you have a clear view of Grenzstadt.

The tower featured a 2 floor lobby which its floors and ceiling is made with Red, white wool along with snow blocks and glowstones. The tower have two elevators and two stairs. At the very rooftop of the tower is the Outdoor observatory which lets you have a clear view of Grenzstadt.

Windows Of Grenzstadt

Is a restaurant located at the 14th floor of the tower. It is modeled after the real life World Trade Center North Towers Windows of the World which was located at the 106th and 107th floor.

Windows Of Grenzstadt view
View of the Grenzstadt new spawn from the Windows Of Grenzstadt
The Floors and its occupants
Floors Use Name Owner Date Of Lease
Rooftop Outdoor Observatory View Of Grenzstadt March 5 2026
Floor 14 Restaurant Windows Of Grenzstadt Beta Trade Center Authority March 5 2026
Floor 13 Conference Room Conference Floor Beta Trade Center Authority March 5 2026
Floor 12 Library Library Of Grenzstadt VanillaCake March 5 2026
Floor 11 Office Oasis Bank Oasis March 6 2026
Floor 10 Residency Ostlanda Residency Ostlanda1967 March 8 2026
Floor 9 Embassy JanoSSR Embassy Jano SSR April 22 2026
Floor 8 Office Mt. China bank china April 25 2026
Floor 7 Embassy Ostreich Embassy Ostreich May 9 2026
Floor 6 Residency Treefoi Residency Treefoi March 8 2026
Floor 5 Office Reich Banko Ostlanda1967 May 9 2026
Floor 4 Office Kebab-Yars Jano SSR May 9 2026
Floor 3 Office Ostreich-JanoSSR Attache to Grenzstadt Janoskadar1991 & Ostlanda1967 May 9 2026
Floor 1-2 Main Lobby

The tower was built as a combined concept by Janoskadar of which the Windows of the World of the North Tower and the Outdoor Observatory of the South tower of which he combined in design which resulted with the J. Kadarian tower. Originally it was suppose to be twin towers but due to the space being small and not able to acomodate a second tower and financial strain the design changed.

The May 9 Deal

On May 9 2026, Ostlanda1967 and Janoskadar1991 signed an official document which the remaining available floors of the tower is sold to Ostlanda1967 for $2k+ in addition of a Skyscraper construction in Jano SSR.